From the first quote to the system running on its own, in the order it happened, including the things that went wrong.

22 SEPT 2026

Export starts paying, 110 days in

Between commissioning and today we sent 2,487 kWh to the grid for nothing (£298.50 at 12p) because there was no export MPAN to pay it into. Outgoing Octopus went live this morning at a flat 12p. The paperwork took months, and then Home Assistant and Predbat both needed a nudge before they saw it.

14 SEPT 2026

Leaving the fix five months early for Intelligent Octopus Go

A flat 24.5p is fine for a house that just uses electricity. Ours has a battery, a car and a heat pump arriving in December, so we paid the exit fee and moved to Intelligent Octopus Go: 8p overnight, 34.7p by day. Our cheap window also isn't the one on the advert.

10 JUN 2026

Signed up to Axle: getting paid for grid events

Same day as the inverter swap, we joined Axle's virtual power plant in events-only mode. It pays £1/kWh when the grid needs the battery, and because it settles through the smart meter it pays even though our export still isn't certified.

10 JUN 2026

The correct inverter is fitted

Five days after we found the wrong unit had been fitted, the installer came back and swapped the 6 kW EC 6.0 SP for the EC 8.0 SP we ordered, well before export certification clears.

7 JUN 2026

First tune-up: three small fixes from a config review

Three days in, we checked the whole automation stack against what's actually running on the box. Predbat is still in monitor mode, but the review found an automation bug and two settings to change before it takes control.

Still to come

The heat pump

Due December 2026, after which the house won't burn any gas. We've done the sizing and the sums, but the radiators haven't been changed yet.