Due December 2026, after which the house won't burn any gas. We've done the sizing and the sums, but the radiators haven't been changed yet.
Between commissioning and today we sent 2,487 kWh to the grid for nothing (£298.50 at 12p) because there was no export MPAN to pay it into. Outgoing Octopus went live this morning at a flat 12p. The paperwork took months, and then Home Assistant and Predbat both needed a nudge before they saw it.
A flat 24.5p is fine for a house that just uses electricity. Ours has a battery, a car and a heat pump arriving in December, so we paid the exit fee and moved to Intelligent Octopus Go: 8p overnight, 34.7p by day. Our cheap window also isn't the one on the advert.
The battery ran its first paid grid event tonight: 5.5 kW out for an hour, £4.27 at £1/kWh. We also found that once a VPP event starts you can't touch the battery, so we changed Predbat to prepare for events in advance.
Same day as the inverter swap, we joined Axle's virtual power plant in events-only mode. It pays £1/kWh when the grid needs the battery, and because it settles through the smart meter it pays even though our export still isn't certified.
Five days after we found the wrong unit had been fitted, the installer came back and swapped the 6 kW EC 6.0 SP for the EC 8.0 SP we ordered, well before export certification clears.
Three days in, we checked the whole automation stack against what's actually running on the box. Predbat is still in monitor mode, but the review found an automation bug and two settings to change before it takes control.
A day after install, the automation stack is up. Sigenergy, Octopus, Solcast and Predbat are all connected, running on a £50 Dell.
We paid for a Sigenergy EC 8.0 SP. The installer has told us the unit fitted is the 6 kW model. This is what it costs us while we wait for the replacement.
The system went in on 4 June, and the installers found room for a 22nd panel on the roof, taking us from 9.98 to 10.45 kWp at no extra cost.