solar by numbers

Install diary

The journey

From quote to commissioning to a battery that runs itself, written as it happened, including the bits that didn't go to plan.

16 June 2026

Our first Axle event, and teaching the system to see the next one coming

Tonight the battery ran its first paid grid event: a steady 5.5 kW out for an hour, £4.27 of help to the grid at £1/kWh. It also taught us that once a VPP event starts there's no touching the battery, so we rewired Predbat to prepare for events in advance instead of scrambling during them.

axlevpprevenuehome-assistantpredbat

10 June 2026

Signed up to Axle: getting paid for grid events

Same day as the inverter swap, we joined Axle's virtual power plant in events-only mode. It pays £1/kWh when the grid needs the battery, and because it settles through the smart meter, it earns even though our export still isn't certified.

axlevpprevenuehome-assistantpredbat

10 June 2026

The right inverter is on the wall

Five days after we found the wrong unit had been fitted, the installer came back and swapped the 6 kW EC 6.0 SP for the EC 8.0 SP we actually ordered. The race against export certification is won.

hardwareinverterinstall

7 June 2026

First tune-up: three small fixes from a config review

Three days in, we audited the whole automation stack against what's actually running on the box. Predbat is still in training, but the review caught a subtle automation bug and two settings worth changing before it takes control.

home-assistantpredbatsoftwaretuning

5 June 2026

Plot twist: there's a 6 kW inverter on the wall

We paid for a Sigenergy EC 8.0 SP. The installer has just told us the unit fitted is the 6 kW model. Here's what that actually costs us while we wait for the fix.

installhardwaresigenergy