<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>Solar by Numbers · journey</title><description>Install diary for a UK solar and battery project: Sigenergy, Predbat, Octopus Agile, and real daily performance data.</description><link>https://solarbynumbers.co.uk/</link><item><title>Our first Axle event, and teaching the system to see the next one coming</title><link>https://solarbynumbers.co.uk/journey/2026-06-16-first-axle-event/</link><guid isPermaLink="true">https://solarbynumbers.co.uk/journey/2026-06-16-first-axle-event/</guid><description>Tonight the battery ran its first paid grid event: a steady 5.5 kW out for an hour, £4.27 of help to the grid at £1/kWh. It also taught us that once a VPP event starts there&apos;s no touching the battery, so we rewired Predbat to prepare for events in advance instead of scrambling during them.</description><pubDate>Tue, 16 Jun 2026 00:00:00 GMT</pubDate></item><item><title>Signed up to Axle: getting paid for grid events</title><link>https://solarbynumbers.co.uk/journey/2026-06-10-axle-vpp-signup/</link><guid isPermaLink="true">https://solarbynumbers.co.uk/journey/2026-06-10-axle-vpp-signup/</guid><description>Same day as the inverter swap, we joined Axle&apos;s virtual power plant in events-only mode. It pays £1/kWh when the grid needs the battery, and because it settles through the smart meter, it earns even though our export still isn&apos;t certified.</description><pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate></item><item><title>The right inverter is on the wall</title><link>https://solarbynumbers.co.uk/journey/2026-06-10-the-right-inverter/</link><guid isPermaLink="true">https://solarbynumbers.co.uk/journey/2026-06-10-the-right-inverter/</guid><description>Five days after we found the wrong unit had been fitted, the installer came back and swapped the 6 kW EC 6.0 SP for the EC 8.0 SP we actually ordered. The race against export certification is won.</description><pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate></item><item><title>First tune-up: three small fixes from a config review</title><link>https://solarbynumbers.co.uk/journey/2026-06-07-first-tune-up/</link><guid isPermaLink="true">https://solarbynumbers.co.uk/journey/2026-06-07-first-tune-up/</guid><description>Three days in, we audited the whole automation stack against what&apos;s actually running on the box. Predbat is still in training, but the review caught a subtle automation bug and two settings worth changing before it takes control.</description><pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate></item><item><title>The brain is live: Home Assistant and Predbat take over</title><link>https://solarbynumbers.co.uk/journey/2026-06-05-the-brain-is-live/</link><guid isPermaLink="true">https://solarbynumbers.co.uk/journey/2026-06-05-the-brain-is-live/</guid><description>One day after install, the automation stack is running. Sigenergy, Octopus, Solcast and Predbat are all talking to each other on a £50 Dell.</description><pubDate>Fri, 05 Jun 2026 00:00:00 GMT</pubDate></item><item><title>Plot twist: there&apos;s a 6 kW inverter on the wall</title><link>https://solarbynumbers.co.uk/journey/2026-06-05-wrong-inverter/</link><guid isPermaLink="true">https://solarbynumbers.co.uk/journey/2026-06-05-wrong-inverter/</guid><description>We paid for a Sigenergy EC 8.0 SP. The installer has just told us the unit fitted is the 6 kW model. Here&apos;s what that actually costs us while we wait for the fix.</description><pubDate>Fri, 05 Jun 2026 00:00:00 GMT</pubDate></item><item><title>Install day: 22 panels where 21 should have gone</title><link>https://solarbynumbers.co.uk/journey/2026-06-04-install-day/</link><guid isPermaLink="true">https://solarbynumbers.co.uk/journey/2026-06-04-install-day/</guid><description>The system went in on 4 June, and the installers squeezed a 22nd panel onto the roof. We went from 9.98 to 10.45 kWp for free.</description><pubDate>Thu, 04 Jun 2026 00:00:00 GMT</pubDate></item></channel></rss>